GrainDesk

USDA WASDE | April 2019

Soybean meal| Brazil2016/17

Season‹›

Balance sheet | Brazil

Million Metric Tons

2015/162016/17 | Mar 192016/17 | Apr 19Chg MtChg %
Beginning stocks3.812.712.710.000.0%
Production30.7531.2831.280.000.0%
Imports0.030.040.040.000.0%
Domestic use16.4716.9416.940.000.0%
Exports15.4113.7613.760.000.0%
Ending stocks2.713.323.320.000.0%
Stocks-to-use8.5 %10.8 %10.8 %0.0 pt–

Stocks-to-use | 2016/17

10.8 %

3-yr avg

10.5 %

+0.3 pt

5-yr avg

10.8 %

0.0 pt

Stocks-to-use = ending stocks ÷ (domestic use + exports), USDA convention for a country. Gaps in percentage points.

2015/16: latest USDA figure. 2016/17: March 2019 report vs April 2019 report; changes = April 2019 minus March 2019.

The season's story | 2016/17

From USDA's first projection to its latest estimate.

First projectionLatest estimateTotal change%Range (min – max)Reports
Production31.00May 1631.28Apr 19+0.28+0.9%31.00 – 32.1235
Imports0.02May 160.04Apr 19+0.02+100.0%0.02 – 0.0435
Domestic use16.20May 1616.94Apr 19+0.74+4.6%15.85 – 17.0435
Exports15.80May 1613.76Apr 19−2.04−12.9%13.76 – 15.8035
Ending stocks3.35May 163.32Apr 19−0.03−0.9%1.98 – 4.2835

Season comparison | Brazil

Latest USDA figure for each season, against the average of the 3 and 5 previous seasons.

2016/17

31.28 Mt

vs 3-yr avg

+1.08

+3.6%

vs 5-yr avg

+1.80

+6.1%

Rank

12 of 20 seasons

Averages are computed on the 3 / 5 seasons preceding each season. Click a bar to open that season.

USDA monthly revisions | 2016/17

How USDA revised this season report after report, and how it usually revises at the same point of the cycle.

Horizon

Estimate, report after report | 2016/17

Month-on-month change | 2016/17

Seasonality = average USDA revision at the same point of the cycle (from the first projection in May), over 16 past seasons. The seasonal path applies it to this season's first projection.

Revision trajectories compared

Cumulative change vs USDA's first projection (May of the first year), in %. Add seasons to compare.

Horizon
Compare with
2016/17